top of page

Plastering phase 3 begins

With the concrete slab dry, the pipe,work is nearly done and plastering has begun.. It is looking very smart indeed.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • Twitter Clean
  • w-youtube
  • facebook

       Herona Hospital      
  Serving our community 

Small He
IMG-20171016-WA0001.jpg
bottom of page